Optimization Control Strategy for Base Stations Based on
Abstract: With the maturity and large-scale deployment of 5G technology, the proportion of energy consumption of base stations in the smart grid is increasing, and there is an urgent need to
Setting up a 5G base station is expensive, with costs ranging from $100,000 to $200,000 per site. This price includes hardware, installation, site rental, and maintenance. Urban areas often have higher costs due to land prices and infrastructure challenges.
According to the energy consumption characteristics of the base station, a 5G base station energy consumption prediction model based on the LSTM network is constructed to provide data support for the subsequent BSES aggregation and collaborative scheduling.
The third Belgrade Energy Forum, BEF 2025, started today in Serbia's capital city, welcoming four hundred participants from more than 30 countries from the region, Europe and beyond. The two-day conference, organized by Balkan Green Energy News, features eight panels with over 50 officials, executives and prominent energy experts.
• The 5G base station energy consumption prediction model based on LSTM proposed in this paper takes into account the energy consumption characteristics of 5G base stations. The prediction results have high accuracy and provide data support for the subsequent research on BSES aggregation and optimal scheduling.
PDF version includes complete article with source references. Suitable for printing and offline reading.
Get detailed specifications, case studies, and technical data for our PV container and energy storage solutions.
123 Renewable Energy Street
London EC1A 1BB, United Kingdom
+44 20 7127 4182
Monday - Friday: 8:00 AM - 6:00 PM GMT